4GL (1) 人才發展 (10) 人物 (3) 太陽能 (4) 心理 (3) 心靈 (10) 文學 (31) 生活常識 (14) 光學 (1) 名句 (10) 即時通訊軟體 (2) 奇狐 (2) 音樂 (2) 產業 (5) 郭語錄 (3) 無聊 (3) 統計 (4) 新聞 (1) 經濟學 (1) 經營管理 (42) 解析度 (1) 遊戲 (5) 電學 (1) 網管 (10) 廣告 (1) 數學 (1) 機率 (1) 雜趣 (1) 證券 (4) 證券期貨 (1) ABAP (15) AD (1) agentflow (4) AJAX (1) Android (1) AnyChart (1) Apache (14) BASIS (4) BDL (1) C# (1) Church (1) CIE (1) CO (38) Converter (1) cron (1) CSS (23) DMS (1) DVD (1) Eclipse (1) English (1) excel (5) Exchange (4) Failover (1) FI (57) File Transfer (1) Firefox (2) FM (2) fourjs (1) gladiatus (1) google (1) Google Maps API (2) grep (1) Grub (1) HR (2) html (23) HTS (8) IE (1) IE 8 (1) IIS (1) IMAP (3) Internet Explorer (1) java (3) JavaScript (22) jQuery (6) JSON (1) K3b (1) LED (3) Linux (112) Linux Mint (4) Load Balance (1) Microsoft (2) MIS (2) MM (51) MSSQL (1) MySQL (27) Network (1) NFS (1) Office (1) Oracle (125) Outlook (3) PDF (6) Perl (59) PHP (33) PL/SQL (1) PL/SQL Developer (1) PM (3) Postfix (2) postfwd (1) PostgreSQL (1) PP (50) python (1) QM (1) Red Hat (4) Reporting Service (28) ruby (11) SAP (234) scp (1) SD (16) sed (1) Selenium-WebDriver (5) shell (5) SQL (4) SQL server (8) SQuirreL SQL Client (1) SSH (2) SWOT (3) Symantec (2) T-SQL (7) Tera Term (2) tip (1) tiptop (22) Tomcat (6) Trouble Shooting (1) Tuning (5) Ubuntu (33) ufw (1) utf-8 (1) VIM (11) Virtual Machine (2) vnc (3) Web Service (2) wget (1) Windows (19) Windows (1) WM (6) youtube (1) yum (2)

2013年4月12日 星期五

Assigning a Revision Level to a Material

如果T-Code CC11告訴你Revision Level沒有activate,就去IMG -> Logistics -- General -> Engineering Change Management -> Setup Control Data 裡面,將Rev. Level Act.的checkbox打勾,就可以activate Revision Level function

http://help.sap.com/saphelp_470/helpdata/en/d8/73201b4b7511d1894b0000e8323c4f/content.htm

Entering content frameProcedure documentation Assigning a Revision Level to a Material Locate the document in its SAP Library structure
Use

You can assign a revision level to a material either from an engineering change management function or while you are processing a material master record or BOM for the material.
This section explains how to change the revision level from engineering change management functions.
Prerequisites You can only assign a revision level to a material that has a material master record.
  • If you create a material with Create ® Immediately, the system creates a material master record immediately. In this case, the revision level can also be allocated immediately.
  • If you create a material with Create ® Schedule, the system first creates a document (and no material master record). In this case, the revision level cannot be assigned yet. The material master record is not created until you activate the scheduled material, and then a revision level can also be assigned.
Procedure From the Engineering Change Management menu, choose the Revision level option. The following options are available: create, change, and display material revision level.
To create a revision level for a material:
  1. Choose Logistics ® Central functions ® Engineering Change Management ® Revision Level ® Create.
You see the Create Revision Level: Initial Screen.
  1. Enter the material that you want to assign a revision level to and select This graphic is explained in the accompanying text.
You see the Create Revision Level: Detail.
  1. Enter the change number that you want to assign a revision level to.
  1. The possible entries in the Revision level field depend on your company-specific settings (Customizing for Engineering change management under Set up control data).
      • If internal number assignment is defined for revision levels, do not make an entry in the Revision level field. Confirm your entry. The system assigns the next available revision level from the defined number sequence. You can overwrite this default value with another value. However, the revision level you enter must be defined in the sequence and must not have been assigned to the material so far.
      • If external number assignment is defined for revision levels, the system still assigns the next available revision level from the defined number sequence. You can overwrite this default value with another value. However, the revision level you enter need not be defined in the sequence.
Note
You can define the settings in Customizing such that a higher revision level must be assigned for both external and internal number assignment.
A message appears telling you which revision level has been assigned to the material.
  1. Save the revision level for your material.
Note
When assigning the revision level from the processing functions for the material master or the bill of material, you find the functions for maintaining the revision level under the menu option Extras.
Leaving content frame