其實,我用Material Variant去生產就好,不要用Configurable Material生產,對生產單位而言比較簡單。而且成本也可以使用標準成本。
Cost Estimation of Configurable material
-------------------------------------------------------------------------------------------------------------------------
Dear All,
Its
implied that configurable material will not have its BOM and Routing
howeve it will select the material as per requirment. Can any help me
out how to do take cost estimation of confugurable material?
Thanks,
sneha
-------------------------------------------------------------------------------------------------------------------------
sneha
-------------------------------------------------------------------------------------------------------------------------
Hi
Based on the Chars you select while creating a sales order, the Sales Order BOM is selected..
With this BOM, the sales order cost estimate is created...
The
settings to create a sales order cost estimate upon saving of sales
order are to be done in Requirement class (IMG>CO>Prod Costing
> Cost Obj Contr > Product Cost By Sales Order > Control of
....)
Br, Ajay M
-------------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------
Dear Ajay,
Thanks
for your inputs!!! However, we are doing not Sales order cost
estimation but taking the cost rollup at Material. Please suggest how
to perform cost estimation at material level for configurable material.
thanks,
Sneha
-------------------------------------------------------------------------------------------------------------------------Sneha
Hi
Cost
estimate from CK11N for config material does not make sense... and
neither it is possible for BOM does not exist for the same in CS01...
You need to have Sales order cost estimate...
If you do from Ck11N, it will include components for all the chars and your cost estimate value would touch the sky
Imagine
a Car - It has components for red paint, black paint, blue paint etc...
If you do from Ck11N, it will include all the paints in the cost, which
is wrong..
Sales order cost estimate will include only the color desired by customer
Br, Ajay M
-------------------------------------------------------------------------------------------------------------------------
hi sneha..
I think you may follow the steps :
1. Creat SO in ref. of Customer PO VA01
2. Through MRP run Plan order will be created with ref. to SO MD50/MD04
3. Convert Plan Order to Prod. Order MD04
4. Goods issue to Prod Ord. MB1A/MIGO
5. Confirmation of Prod Ord. CO15
6. GR against Prod. Ord. MB31/MIGO
7. Order Settlement for Prod. Ord. KO88
8. Delivery to finished goods VA01N
kkumar
-------------------------------------------------------------------------------------------------------------------------
Hi Sneha,
a configurable material always needs a configuration - otherwise it cannot be costed.
This configuration can be provided
- in a sales document or
- in a configured material or
- in the simulation environment of t-code CU50
Configured materials can be costed by t-code CK11N.
In CU50 you can create and display cost estimates, but you cannot save them.
Best regards,
Johannes
-------------------------------------------------------------------------------------------------------------------------This configuration can be provided
- in a sales document or
- in a configured material or
- in the simulation environment of t-code CU50
In CU50 you can create and display cost estimates, but you cannot save them.