http://www.erpgreat.com/production/functions-of-production-version.htm
Functions of Production Version
Can somebody enlighten me on the functions
of production version and some tips on its configuration?
Production Versions are used to describe the production
process to be used for planned / production order.
You can use the production versions based on:
1. Lot size qty
2. Bom explosion dates
3. Based on MRP Group
Why is it required?
Suppose you have 2/3 production lines and 2/3
alternative BOMs to produce one FG.
How system will come to know which BOM and Routing
to be used. This is done thru Prod.Version.
In production version we maintain the combination
of BOM and routing.
Also it can be designed with lot size or validity
period.
Go to MM02--->MRP4 / Work scheduling view ---->
Prod.Version.
Enter the validity period and lot size.
After entering the reqd. routing no. and BOM
alternative , carry a check.
After getting the Green signals ,Continue.
Thus you have saved the prod. version.
Mass processing TCode- C223.
Does this mean that I have to activate all
the BOM’s if in case I have 3 alternative BOM’s? if yes, then, will it
these 3 BOM’s be exploded in MRP? I’m just worried ‘coz I might bloat our
inventory if there are three active BOM’s.
No.First of all need not worry about the BOM explosion.
As I told you earlier which BOM and which Routing
is decided by Prod.Version.
So in MRP the active prod.version only will be
considered. Thus active BOM and active Routing will be used for MRP.
The question comes: How to deactivate the
alternative BOMs and Routing?
Two Ways:
1. You lock all other non-relevant Prod.Versions
in MM02 of the FG/SFG material.(Every alternative BOM and routing forms
a Prod.Version) Thus even if there are 2/3 prod.versions System will go
and check for Unlocked prod. version and use it.
2. If you don't want to do this business of "Lock
& Unlock" just place the required version at the first place in list
of prod.versions in MRP4 view of the material.
Once system finds the first prod.version it will
not spend energy in searching other alternatives.
Also please.don't forget to maintain the selection
value of "2" in MRP 4 view for BOM selection.
This will enable you to start the use of prod.
version functionality in SAP-PP.(very good tool for practical purposes,
costing and MRP).
This man is too old to remember everything in his brain. Right now, he needs a place to write down what he has studied.
標籤
4GL
(1)
人才發展
(10)
人物
(3)
太陽能
(4)
心理
(3)
心靈
(10)
文學
(31)
生活常識
(14)
光學
(1)
名句
(10)
即時通訊軟體
(2)
奇狐
(2)
爬蟲
(1)
音樂
(2)
產業
(5)
郭語錄
(3)
無聊
(3)
統計
(4)
新聞
(1)
經濟學
(1)
經營管理
(42)
解析度
(1)
遊戲
(5)
電學
(1)
網管
(10)
廣告
(1)
數學
(1)
機率
(1)
雜趣
(1)
證券
(4)
證券期貨
(1)
ABAP
(15)
AD
(1)
agentflow
(4)
AJAX
(1)
Android
(1)
AnyChart
(1)
Apache
(14)
BASIS
(4)
BDL
(1)
C#
(1)
Church
(1)
CIE
(1)
CO
(38)
Converter
(1)
cron
(1)
CSS
(23)
DMS
(1)
DVD
(1)
Eclipse
(1)
English
(1)
excel
(5)
Exchange
(4)
Failover
(1)
Fedora
(1)
FI
(57)
File Transfer
(1)
Firefox
(3)
FM
(2)
fourjs
(1)
Genero
(1)
gladiatus
(1)
google
(1)
Google Maps API
(2)
grep
(1)
Grub
(1)
HR
(2)
html
(23)
HTS
(8)
IE
(1)
IE 8
(1)
IIS
(1)
IMAP
(3)
Internet Explorer
(1)
java
(4)
JavaScript
(22)
jQuery
(6)
JSON
(1)
K3b
(1)
ldd
(1)
LED
(3)
Linux
(117)
Linux Mint
(4)
Load Balance
(1)
Microsoft
(2)
MIS
(2)
MM
(51)
MSSQL
(1)
MySQL
(27)
Network
(1)
NFS
(1)
Office
(1)
OpenSSL
(1)
Oracle
(126)
Outlook
(3)
PDF
(6)
Perl
(60)
PHP
(33)
PL/SQL
(1)
PL/SQL Developer
(1)
PM
(3)
Postfix
(2)
postfwd
(1)
PostgreSQL
(1)
PP
(50)
python
(5)
QM
(1)
Red Hat
(4)
Reporting Service
(28)
ruby
(11)
SAP
(234)
scp
(1)
SD
(16)
sed
(1)
Selenium
(3)
Selenium-WebDriver
(5)
shell
(5)
SQL
(4)
SQL server
(8)
sqlplus
(1)
SQuirreL SQL Client
(1)
SSH
(2)
SWOT
(3)
Symantec
(2)
T-SQL
(7)
Tera Term
(2)
tip
(1)
tiptop
(24)
Tomcat
(6)
Trouble Shooting
(1)
Tuning
(5)
Ubuntu
(37)
ufw
(1)
utf-8
(1)
VIM
(11)
Virtual Machine
(2)
VirtualBox
(1)
vnc
(3)
Web Service
(2)
wget
(1)
Windows
(19)
Windows
(1)
WM
(6)
Xvfb
(2)
youtube
(1)
yum
(2)
沒有留言:
張貼留言